Moraga Remodeling Contractor and Design-Build Firm

Taragano Design and Build is a Moraga remodeling contractor and design-build firm, with our office at 1640 School St, Suite 105M4 in Moraga. We build home additions, ADUs, whole-house remodels and custom homes, plus kitchens and bathrooms. Design, engineering, permits and construction sit under one contract.

Moraga runs on two desks. The Town reviews planning and design, and Contra Costa County issues the building permit and inspects the work. We plan for both from the first sketch, along with the hillside limits Moraga voters wrote in 1986 and the ADU rules the Town amended in 2026.

Call or Text (925) 388-6353
Town of Moraga California

Our office is here in Moraga. Proudly serving homeowners throughout Moraga and Lamorinda.

Who Approves What in Moraga

Moraga splits a project between two agencies. The Town approves the planning and design side first, then Contra Costa County issues the building permit and inspects the work. These are the agencies your project will touch.

Planning and design review: Town of Moraga Building permit and inspections: Contra Costa County Fire: Moraga-Orinda Fire District Sewer: Central San Water: EBMUD Contractor license: CSLB #1143420

Our office is at 1640 School St, Suite 105M4, Moraga, CA 94556. Local requirements on this page were last reviewed in November 2026. They are an overview, not legal advice, and they change. We confirm what applies to your specific parcel as part of every project.

Hiring a General Contractor in Moraga

A general contractor is the licensed party who signs the building contract and carries legal responsibility for the work: holding the permit, sequencing the trades, calling inspections at the right stage, and answering for anything that fails one.

Most Moraga homeowners start one of two ways. They hire an architect, get drawings approved, then bid the drawings out to general contractors. Or they hire a design-build firm that designs, permits and builds under one contract.

The first path often breaks down at the bid. The drawings are finished, the Town has reviewed them, and only then do you learn what they cost to build. In a design-build contract, construction cost is part of the design conversation from the start. We ask for your budget and design to it, so you are not paying to redraw an approved plan.

Whichever path you choose, check the contractor’s license with the Contractors State License Board before you sign anything. Ours is CSLB #1143420, and we are bonded and insured. It is also worth reading what should be in a contractor agreement and whether to hire one contractor or several.

Already have an architect and permitted drawings? Bring them. We are glad to work as your general contractor and build from your plans. If you want us to design it, we handle that too.

Planning a Home Renovation in Moraga

Six things decide what a Moraga project can be, and all six are worth answering before anyone draws a floor plan.

Two Desks, in Order

Any change to the outside of a Moraga home, from an addition or a deck to enlarging a window, needs approval from the Town’s Planning Department before you can apply for a building permit. The building permit, plan check and inspections then come from Contra Costa County’s Department of Conservation and Development. Two agencies, in that order, and skipping the sequence is the most common way a Moraga project loses a month.

Two Review Tracks

A project that meets setbacks and the Town’s Design Guidelines can go through Administrative Design Review with planning staff, about 60 days once the application is complete. Neighbors get 10 days’ notice before approval, then there is a 10-day appeal period. New homes, and projects that need an exception to the guidelines, go to the Design Review Board instead, which averages about 90 days according to the Town’s own FAQ. The two most common exceptions: going over the floor area ratio, and a hillside addition or deck with the floor more than 4 feet above grade.

Hillsides and the Open Space Ordinance

Grading or decks on slopes steeper than 20% need a Hillside Development Permit from the Design Review Board, generally with a geotechnical report and a slope stability analysis. Separately, the Moraga Open Space Ordinance, passed by voters in April 1986, bars building on slopes over 20% or within 500 feet of a major ridgeline on the open-space land it covers, a limit upheld in Northwood Homes v. Town of Moraga. Most existing homes are not on that land, but lots that border it get closer review.

Wildfire Requirements

The Moraga-Orinda Fire District covers the whole town, and it has adopted local fire and wildland-urban interface requirements that go beyond the state minimum, which is a real difference from Lafayette next door. The state released updated fire hazard severity maps in February 2025. In a very high hazard zone, new construction and additions must use wildfire-resistant roofing, vents, siding, decking and windows. The separate Zone 0 rules covering the first five feet around a house were adopted by the Board of Forestry in August 2026 and are still being finalized at the state level, so we confirm the current requirements for your address before design starts.

Trees

Removing a native tree, an orchard tree or a tree of historical significance needs a Town permit, per the Town’s FAQ on landscaping, pools and trees. We map trees on the site survey before the footprint is drawn, not after.

Utilities

Sewer is Central San and water is EBMUD. An addition with new bathrooms, or an ADU, can mean sewer lateral work and a new water service, which we price into the design rather than discover during construction.

Home Additions in Moraga

Moraga lots are often sloped and most homes sit close to their setbacks, so an addition usually goes up or out the back. See our home additions page, and if you are budgeting, start with what drives the cost of a home addition.

Second-Story Additions

Going up keeps the yard. Many Moraga second stories are approved at staff level. The Design Review Board steps in if the addition would put more than two 2-story homes side by side, can be seen from a designated scenic corridor, or exceeds the floor area ratio on a lot of 40,000 sq ft or less. Homes top out at 35 feet and two stories.

Primary Suites and Rear Expansions

A new primary suite off the back is a frequent Moraga addition. On a sloped lot that often means a raised foundation, retaining walls and drainage, which we engineer into the design and the price.

Additions on Hillside Lots

If the new floor sits more than 4 feet above grade, the Design Review Board has to approve an exception. We start with a geotechnical report so the foundation is settled before you commit to a layout.

Complete Home Renovations in Moraga

Much of Moraga’s housing is decades old: good bones, dated systems. See our whole-house remodeling page, and what is actually included in construction costs.

Down-to-the-Studs Remodels

A new layout, new systems and new finishes in one project, instead of three remodels over ten years.

New Systems Behind the Walls

Older wiring, panels and plumbing get replaced while the walls are open, and sized for how you live now, including EV charging and heat pumps.

Wildfire Hardening in the Same Project

A whole-house remodel is the cheapest time to upgrade vents, roofing, siding and windows to wildfire-resistant materials, because the walls are already open.

ADU Construction in Moraga

Moraga’s amended ADU ordinance was adopted July 8, 2026 and took effect August 7, 2026. See our ADU page, the garage conversion cost guide, or the Town’s own ADU guidance.

The Streamlined Track

A detached ADU up to 800 sq ft, a conversion inside your home, or a junior ADU up to 500 sq ft is processed ministerially, over the counter with no public hearing, if it meets the objective standards. The Town reviews an application for completeness within 15 business days and must decide within 60 calendar days of a complete application. Setbacks are 4 feet at the side and rear, no parking is required, and converting a legal garage needs no replacement parking.

Standard and Detached ADUs

Standard ADUs run from 150 to 1,200 sq ft and must meet the Town’s development and design standards. A detached ADU is capped at 16 feet, or 18 feet within half a mile of a major transit stop or high-quality transit corridor, plus 2 feet to match the primary roof pitch. An attached ADU is limited to 50% of the primary unit but never restricted below 800 sq ft. Detached units often need their own address and electrical meter, and most are designed all-electric.

Legalizing an Older Unit

If you have a unit built without permits before January 1, 2020, the Town will not deny a permit over building code violations or ADU-law noncompliance unless a correction is needed for health and safety, or the building is substandard. We scope what it takes to bring it up to standard.

Custom Homes in Moraga

Building new in Moraga means working with slope, open space and design review from day one. See our custom homes page.

Tear-Down and Rebuild

Replacing an older house on an existing lot. On Moraga hillsides that means geotechnical design, fire-resistant construction and Design Review Board approval from the start.

Building on a Vacant Lot

Remaining lots are often steep or next to open space. We check slope, access, utilities and any open space ordinance limits before you buy or design.

Kitchen Remodeling in Moraga

In Moraga, a kitchen remodel often means moving a bearing wall to open a closed layout. See our kitchen remodeling page. Before you move a sink or range, read whether to keep or change your kitchen layout.

Opening a Closed Kitchen

Many older Moraga kitchens are closed rooms. Opening one usually means moving a bearing wall, so we engineer the beam before we design the cabinets.

Kitchens Designed Around How You Cook

Workflow, zones and storage come first. Finishes come after the layout works.

Bathroom Remodeling in Moraga

A Moraga bathroom remodel is the moment to fix ventilation and add a curbless shower. See our bathroom remodeling page. Planning for aging in place? Read how accessibility rules apply to a home remodel.

Primary Bathroom Remodels

Curbless showers, real ventilation and natural light, planned for the way you use the room every day.

Adding a Bathroom

A new bathroom means new drain, vent and water lines, which we plan with the rest of the layout so there are no surprises in the floor or walls.

Why Taragano

Why Moraga Homeowners Choose Us

We are Diamond Certified, rated highest in quality. We hold 5.0 stars on Google, Houzz and HomeAdvisor, and we rank in the top 2% of more than 336,000 California contractors on BuildZoom. One contract covers your whole project, so nothing falls through the cracks.

Our office is in Moraga, at 1640 School St, Suite 105M4, Moraga, CA 94556. In Moraga we have remodeled kitchens and bathrooms in and around the Moraga Country Club neighborhood, and we have taken Moraga projects through both the Town and the County permit process. Our larger projects in nearby Orinda and Lafayette go through the same County building department. It is all part of more than 100 projects since 2014.

Local Knowledge

Neighborhoods We Serve In and Around Moraga

Moraga’s neighborhoods were built over several decades, from established ranch-home streets to 1980s planned communities with their own homeowners association rules. A flat lot in Larch and a hillside lot in Corliss are different projects, even at the same square footage.

Campolindo

The north end of town, bordering Lafayette. Mostly single-story ranch and Spanish-influenced homes, where opening the kitchen and adding a primary suite are the usual projects.

Rheem Valley Manor

Central Moraga near the Rheem shopping center. Mid-size lots on gently rolling ground, with room for rear additions on many of them.

Moraga Country Club

Homes and townhomes around the golf course, built mostly in the 1970s and 80s. We have remodeled kitchens and bathrooms in and around this neighborhood. If your home is in an association, its architectural review runs alongside the Town’s.

Sanders Ranch

A 1980s community with some of Moraga’s largest homes. Where an association applies, plan for its review before the Town’s.

Larch

One of Moraga’s flatter neighborhoods. Level lots make ground-floor additions and detached ADUs simpler to plan.

Corliss

Backs up to the Mulholland Ridge open space. Slope, drainage and wildfire-resistant construction shape every addition here.

Surrounding Communities

Lafayette

Next door to Campolindo, with its own city planning process and a different fire district. See our Lafayette page.

Canyon

Unincorporated and wooded, so Contra Costa County handles both planning and building.

FAQ

Common Questions for a Moraga Remodeling Contractor

Who issues building permits in Moraga?

Two agencies, in order. The Town of Moraga Planning Department approves any exterior change, addition or ADU first. Contra Costa County’s Department of Conservation and Development then issues the building permit and inspects the work. Staff-level Administrative Design Review runs about 60 days once an application is complete, and the Design Review Board averages about 90 days. We handle both.

Can I build an ADU on my Moraga lot?

Most single-family lots can have one detached ADU, one ADU inside the house and one junior ADU. Under the ordinance in effect since August 7, 2026, a detached ADU up to 800 sq ft, a conversion or a junior ADU is processed ministerially with no public hearing, with 4-foot side and rear setbacks and no parking requirement. The Town must decide within 60 calendar days of a complete application. Slope, access and utilities decide what actually fits.

Does a sloped lot change an addition in Moraga?

Usually, yes. A slope often means a geotechnical report, a stepped foundation, retaining walls and drainage. Grading or decks on slopes steeper than 20% need a Hillside Development Permit from the Design Review Board, and if the new floor sits more than 4 feet above grade the Board must approve an exception. We price all of that during design, so the number you approve already includes it.

Free Site Visit

Ready to Start Your Moraga Project?

Call or text (925) 388-6353 for a free site visit. We will walk your property, talk through your ideas, and give you a straight answer on scope and timing.